Blauberg ENH S21 V.2
- Description
- Modifications
- Downloads
- Designation key
- Compatibility chart
- Heater capacity selection diagram
FEATURES
The heater is designed for integration into a ventilation system and joint operation with an air handling unit equipped with a control system used to switch on the heater and control its operation. The heater maintains the supply duct air temperature at a point set by the unit controller.Compatible with Ø 125 up to 315 mm air ducts. MOUNTINGThe heater design ensures its mounting on the round ducts in any position by means of clamps (included in delivery). The air flow direction shall match the direction of the arrow on the heater casing.In case of horizontal mounting the control box must be installed with the cover upwards. Swivel range from the normal position up to max. 90°. Do not install the control box with the cover downwards. |
DESIGN
The casing, the junction box and the heater cover are made of galvanized steel with the heating elements in stainless steel. The heater casing is additionally heat-insulated with 20 mm non-flammable mineral wool layer. The heaters are equipped with rubber seals for airtight connection to the air ducts. ENH S21 V.2 duct heaters are equipped with a factory-wired power supply cable and control cable, as well as a duct temperature sensor which is connected to the air handling unit. The temperature is controlled smoothly by the air handling unit controller using a PWM signal in cycles of 10 seconds. Load commutation is carried out by a semiconductor device (triac). The heaters are equipped with overheat thermostats:
|
Modification name | |
---|---|
ENH 125-0.6-1 S21 V.2 | |
ENH 125-0.8-1 S21 V.2 | |
ENH 125-1.2-1 S21 V.2 | |
ENH 150-0.8-1 S21 V.2 | |
ENH 150-1.2-1 S21 V.2 | |
ENH 150-1.7-1 S21 V.2 | |
ENH 150-2.0-1 S21 V.2 | |
ENH 160-0.8-1 S21 V.2 | |
ENH 160-1.2-1 S21 V.2 | |
ENH 160-1.7-1 S21 V.2 | |
ENH 160-2.0-1 S21 V.2 | |
ENH 200-1.2-1 S21 V.2 | |
ENH 200-1.7-1 S21 V.2 | |
ENH 200-2.0-1 S21 V.2 | |
ENH 250-1.2-1 S21 V.2 | |
ENH 250-2.0-1 S21 V.2 | |
ENH 250-3.0-1 S21 V.2 | |
ENH 315-2.0-1 S21 V.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Series | Connected air duct diameter [mm] | Heater power [kW] | Number of phases | Compatibility with automation | ||
ENH | 125; 150; 160; 200; 250; 315 | – | 0.6; 0.8; 1.2; 1.7; 2.0; 3.0 | – | 1: single-phase | S21 V.2: compatible with an S21 automation without a DB-9M connector |
Heater model | Unit model |
ENH 125 S21 V.2 | KOMFORT EC SB unit with a ∅ 125 pipe and an S21 automation without a DB-9M connector |
ENH 150 S21 V.2 | KOMFORT EC SB unit with a ∅ 150 pipe and an S21 automation without a DB-9M connector |
ENH 160 S21 V.2 | KOMFORT EC SB unit with a ∅ 160 pipe and an S21 automation without a DB-9M connector |
ENH 200 S21 V.2 | KOMFORT EC SB unit with a ∅ 200 pipe and an S21 automation without a DB-9M connector |
ENH 250 S21 V.2 | KOMFORT EC SB unit with a ∅ 250 pipe and an S21 automation without a DB-9M connector |
ENH 315 S21 V.2 | BlauAIR unit with a ∅ 315 pipe and an S21 automation without a DB-9M connector |
The ENH heater parameters calculation example: It is necessary to select a heater for supply air post-heating to a temperature of +24 °C, provided the temperature downstream of the heat exchanger is +17 °C. Therefore it is essential to increase temperature by +7 °C. The ventilation system incorporates the KOMFORT EC SB 350 S21. Rated air capacity 400 m³/h.Determine the intersection of the post-heating temperature line (+7 °C) and the rated air capacity line (400 m³/h). In this case the 1200 W heater capacity provides necessary post-heating (+7 °C). The ENH 160-1.2-1 with the diameter matching the spigot diameter of the air handling unit KOMFORT EC SB 350 S21 is a suitable model. |