Login
Not registered yet? Take advantages of registration:
Products saving in a binding to the projects
Online consultation from experts
Signup

Privacy policy

Blauberg CP-2

CP-2
CP-2
zoom

Drain pump.
Model features
  • Description
  • Modifications
  • Downloads
Description
Description
USE MOUNTING

The drain pump provides extraction and discharge of condensate that may form in the heat exchanger during heat recovery.

For CP-2 pump both horizontal and vertical installation is possible. The pump drain pan must be installed in the horizontal position only, in compliance with the user’s manual.

DESIGN  
1 – condensate water inlet;
2 – air intake fitting for Ø 4x6 hose;
3 – condensate outlet fitting;
4, 8 – fitting for Ø 4x6 connecting hose;
5 – fitting for a drain pipe;
6 – removable terminal block;
7 – mounting plate; 
9 – pump lock;
10 – removable electric cable socket;
Modifications
Modification name
CP-2
Modification name
CP-2
+
Documents archieve
Documents archieve
Name
CP-2 - image (png 406.11Kb)
CP-2 - data sheet (pdf 244.37Kb)
CP-2 - user manual (pdf 1.36Mb)